Concrete Canvas® in oil and gas projects

Companies around the world choose Concrete Canvas® (CC) and CC Hydro™ (CCH) for oil and gas sites. CC and CCH are used mainly for erosion control and secondary containment. Installation needs minimal or no equipment, eliminating the risk of rebound, debris and spatter. CC and CCH install many times faster than conventional alternatives, reducing contractor time on site and site downtime.

Learn more about what Concrete Canvas® can do:

Sealing a protective bundSealing a protective bund

Kazakhstan, Atyrau region

August 2023CCX-M

In this project, GCCM was used to strengthen and seal a protective bund around the discharge tank of a pumping station. The work was completed within 1 day at low cost. Using CCX-M significantly shortened construction time: the installation rate reached 300 m² per 8-hour shift with a crew of 6.

Rehabilitating protective bundsRehabilitating protective bunds

Colombia, Acacías

July 2023CCHT1

CC Hydro (CCHT) was chosen for lining and rehabilitating secondary containment bunds at an oil storage facility. Both lined and unlined bunds had been damaged by erosion from heavy rain and wind. In total, 2,250 m² of material was installed in less than 20 days, despite very unfavourable weather during the works.

Project on the Concrete Canvas website →
Preventing rainwater infiltrationPreventing rainwater infiltration

Qatar, Mena

November 2020CCT2

CCT2 Concrete Canvas was installed as part of a slope protection project at a petrochemical plant. A protective bund on the site was gradually eroding, creating a traffic hazard from possible falls of soil and other material onto the road below. A team of 6 completed the work in 3 stages over 26 days, installing a total of 4,700 m² of material.

Project on the Concrete Canvas website →