Concrete Canvas® in railway construction

The speed and ease of installing Concrete Canvas® make it an ideal tool for critical tasks on railway lines. It avoids the problems of conventional concrete, such as rebound from shotcrete, and the need for bulky equipment. As a result, railway works can proceed without long interruptions to train traffic.

Learn more about what Concrete Canvas® can do:

Protecting surface infrastructureProtecting surface infrastructure

Georgia, Tbilisi

August 2023CCX-M

In this project, CCX-M was used to stabilise slopes to protect surface infrastructure: railway tracks. The work had to be done in confined conditions. A crane was used to unroll the CCX-M rolls. The work was carried out by a crew of 5 with industrial climbers. A total of 1,850 m² was laid in 2 days.

Protecting a channel from washoutProtecting a channel from washout

United Kingdom, Northamptonshire

February 2024CCT2

GCCM was used to line a channel and provide long-term protection from runoff. The channel is located next to a railway line. Because the formwork of the V-shaped gully was failing, the channel was originally going to be concreted. However, the client decided against cast-in-place concrete, as it would have required both formwork and masonry facing. CCT2 proved the most suitable solution for the site. A total of 4,400 m² of Concrete Canvas was installed.

Lining a drainage channelLining a drainage channel

United Kingdom, Somerset

August 2021CCT2

Concrete Canvas was installed to protect a drainage channel along a railway line from erosion. The line runs through a steep cutting that was being washed out by surface water from adjacent farmland. A channel had been dug earlier to prevent this, but over time it became heavily overgrown. A total of 1,000 m² of CCT2 was installed. The lining will prevent slope collapse and suppress vegetation growth

Managing water flowsManaging water flows

United Kingdom, Scotland

July 2020CCT2

In 2020, CCT2 Concrete Canvas was installed in Scotland to line two drainage channels that carry water away from the railway to a new drainage system and natural watercourses. The lining prevented washout of the slope surface, which could have led to landslides and local flooding of the tracks. More than 2,500 m² of material was installed.